New Ersel Bank Headquarters

Atelier(s) Alfonso Femia | AF517

SAVE SUBMISSION
Bronze
Meeting room - ©Stefano Anzini
Upper floor Open space - ©Stefano Anzini
Offices - ©Stefano Anzini
Meeting room - ©Stefano Anzini

1 / 18

Sponsor
Comments
Innovation
Functionality
Creativity
Eco-Social Impact
Total
JURY VOTES
Large Office
5.28
5.64
5.19
5.11
5.3
Victoria Schneyer
Victoria Schneyer Global Head of Store Design at Hugo Boss
5.5
6
5
5
5.38
David Wei
David Wei Cofounder and Design Director at Hatch Architects
5.97
4.44
5.59
6.17
5.54
Norman-Henner Plattner
Norman-Henner Plattner Head of Store Development at The KaDeWe Group
5
6
5
5
5.25
John Lam
John Lam Co-Founder and Design Strategist at State of Culture
The project demonstrates a comprehe...
5.59
5.2
5.3
5.88
5.49
Gokhan Avcioglu
Gokhan Avcioglu Principal and Founder at Global Architecture Development
5
6
5
5
5.25
Christopher Lye
Christopher Lye Principal at Woods Bagot
5
6
5
5
5.25
Tessa Mansfield
Tessa Mansfield Chief Creative Officer at Stylus
5.5
6
5.5
5
5.5
Andras Klopfer
Andras Klopfer Managing Partner at BWM Retail
5
6
5
5
5.25
Benjamin Iborra Wicksteed
Benjamin Iborra Wicksteed Partner and Creative Director at Mesura
5
5
5
5
5
Eric Wang
Eric Wang Head of Marketing and E-Commerce APAC at Duravit
5.82
6.54
5.86
4.27
5.62
Lene Utbjoe
Lene Utbjoe Discipline Lead at Henning Larsen
5
5
5
5
5
Agata Kurzela
Agata Kurzela Founder and Design Director at Agata Kurzela Studio
5
5.5
5
5
5.13
Client
Caradosso 16 Srl
Floor area
3219 ㎡
Completion
2022
Budget
EUR 11.877.000
Social Media
Instagram Facebook Linkedin Pinterest
Lighting
Furniture
Lighting
Accessories
Furniture

The project actions are based on 7 steps that allowed the implementation of a strategy aimed at enhancing the development of the maximum eligible area of the property on via Caradosso and, at the same time, and a careful requalification of the (internal and external) spaces aimed to develop both functional and flexibility required needs and the aesthetic and functional improvement of important areas of the property.

1.The main objective of the project concerns the enhancement of all the existing rooms of the building thanks to a careful distribution and organization of the functional program. Each choice was taken thanks to an accurate analysis of the spaces: from the historical rooms, to the typical floor plan, from the basement, to the attic.

Particular attention was paid to the relationship and independence between multi-tenant spaces and Ersel spaces, clearly dividing their spaces, and the management of the entrances and internal flows.

2.In addition to the facade on Via Caradosso, which has been completely cleaned and restored, one of the main features of the project is its central garden. The courtyard, appeared to be a second important opening for all offices. The presence of a dedicated green area is a qualitative space for offices and, thanks to a simple modeling of the ground, it grants the opportunity to bring light to the entire basement floor, making it completely usable. New trees and new shrubs allows this space to become a pleasant break area.

3.One of the most important points developed by the project is the new hall, both for the flow control and management and also to the representation of the new Ersel headquarters.

4.A careful study of all the documents and surveys has allowed to clarify the situation of the administrative documents in possession. In addition to this, thanks to the use of energy bonuses, the project is able to optimize the use of the ground floor area and recover existing surfaces which have been relocated to new spaces destined to offices, as in the basement and in the attic.

5.The redevelopment project of the entire building corresponds with an energy redevelopment. This strategy has allowed, on the one hand, the recovery of surfaces to be dedicated to the new floor area, on the other to optimize the internal comfort and consumption of the building. Passive and active strategies has been used, with a complete replacement of all systems (mechanical, electrical, data) managed by automated systems.

6.It has been used an administrative procedure that allowed to have security regarding the management of the environments, while still allowing the parallel development of the final and executive project. This lead to the optimization of all the design times and costs.

7.The presence of an integrated project team, in which engineering, architecture and interior design dialogue and confront each other, allowed to obtain a project with a definitely higher quality and an optimized working methodology.